| ID | Canal | From | To | Start Date | End Date | Description ( Click to see original C&RT Notice ) | Last Updated |
|---|
|
| 19378 | Middle Level Navigations (Forty Foot River) | Welches Dam Sluice | Welches Dam Sluice | 13 October 2023 | 12 October 2099 | This lock is closed permanently. | 13 Oct 23 19:19:13 |
|
| 25756 | Bridgewater Canal (Main Line) | Agden Bridge No 26 | Dunham Town Bridge No 27 | 02 January 2025 | 29 July 2027 | The Bridgewater Canal is currently closed between Agden Bridge No. 26 and Dunham Town Bridge No. 27 due to a breach. This section is managed by the Bridgewater Canal Company, not the Canal & River Trust. However, as this canal connects to our network and forms part of the Cheshire Cruising Ring, we are liaising closely with them.
Nearest Winding Holes:
* West of the Breach: Between Oughtrington Bridge No. 24 and Lymm Bridge No. 23.
* East of the Breach: Between Seamon's Moss Bridge No. 29 and Broadheath Bridge No. 30.
Canal & River Trust Customers
If any of our customers are stuck on the Bridgewater Canal, please contact our North West Customer Service Team at 0303 0404 040 for support.
Further updates will be provided as more information becomes available. For additional details, visit the Bridgewater Canal Company website: < > | 29 Jul 26 17:51:14 |
|
| 29181 | Anderton Lift | Anderton Lift (River Weaver) | Anderton Lift (Trent and Mersey) | 03 January 2025 | 12 August 2027 | We understand how much the Anderton Boat Lift means to boaters, visitors and the community. We're focussed on finding a solution to get the lift operational again while we look to secure the larger investment for its long-term future. We are still aiming to reopen one caisson in May 2027, as planned.
Since the closure of the lift, the Trust has carried out extensive work to identify the best way to repair and modify the caisson gate lifting mechanisms to prevent similar failures happening again. Several options were considered and in Autumn 2025, after the investigation into the cause of failure had been completed, the detailed engineering design began. The design considered a solution that would remove the need for cables and provide a robust and reliable lifting mechanism. However, as the designs have progressed, the complexity of doing this on such a historic structure has led to the scope, and the forecast cost, increasing significantly – to the point where that option is currently neither practical nor affordable. Consequently, we have needed to consider an alternative solution, based more closely on the existing cable system, to get the lift open and operational for boaters and all those who visit. The solution needs to be safe, legally compliant and in keeping with the historic status of the structure.
We believe we have now found a proposal which requires testing. The next step is for specialist engineers who are familiar with these lifting systems to design and replace the components required before undertaking a series of tests to prove that the solution is safe and viable. The process will also confirm what other works are necessary prior to the lift re-opening for boat use.
Customers and visitors will be able to see this activity being undertaken at the lift this Autumn as we replace elements of the lifting systems and begin testing procedures. We expect to know by December 2026 what further work is required in the new year to reopen the lift by May 2027. We will keep everyone updated through this process as to whether the tests are successful and confirm the forecast opening date.
The Trust will hold an open day at Anderton in the Autumn. We'll publish the date once we have the testing programme and at the most helpful point to share progress. The Trust is aware of how frustrating the closure of the lift has been to boaters and that reopening the lift has seemed to be straightforward to many outside of the project team. The open day will provide an opportunity to share more about the options that have been explored and the constraints we have had to work within to get the lift open. It will also be an opportunity to hear about how we approach a secure future for the boat lift in the longer term. Our priority remains to get the lift operating again for boats. We're sorry for the time it has taken to get to this point – and we'd like to thank everyone for their patience and support while we work towards a solution and the reopening of the lift.
| 12 Aug 26 09:00:05 |
|
| 28898 | River Avon (Kennet and Avon Navigation) | Kelston Lock No 5 | Kelston Lock No 5 | 10 September 2025 | 10 October 2026 | Further to the notice below, please be advised that our assisted passage days at Lock 5, Kelston Lock have now finished.
However our team will be happy to support passage through the lock when we have colleagues and volunteers available.
If you require assistance through the lock please contact us at enquiries.walessouthwest@canalrivertrust.org.uk or 03030 404040 where our team will be able to help with dates and timings. | 10 Oct 25 20:11:23 |
|
| 29735 | Shropshire Union Canal (Llangollen Canal - Main Line) | Grindley Brook Bottom Lock No 14 | Whitchurch Ring Road Bridge No 31A | 22 December 2025 | 10 August 2027 | We have now completed the reinstatement of the flooded field and repairs to the culvert inlet and outlets. The footpath has been re-opened and the field will be re-seeded with stockproof fencing installed over the next few months.
The embankment reconstruction is due to commence this week. The embankment is to be 115-metres long x 5.8-metre high, with 45-degree steep side slopes. It will be constructed using approximately 14,000 tonnes of compacted granular aggregate with geogrid reinforcement at approximately 0.6-metre vertical spacing over its width.
A draft design of the concrete canal channel has been completed and is now being finalised for construction purposes. This will be 9.5-metres wide x 1.6-metres deep. Construction of this channel will commence once the embankment is complete.
Water is continuing to be pumped around the breach with additional pumps being provided to provide resilience and extra pumping capacity.
We will continue to provide updates as work progresses. | 10 Aug 26 14:00:02 |
|
| 29984 | Lee and Stort Navigation (River Lee) | Ware Lock No 2 | Ware Lock No 2 | 21 January 2026 | 19 August 2027 | The navigation closure is to continue to remain in place until the gates are replaced by the EA however they are offering booked assisted passage on 8th September 2026.
Please contact them at [HNL-APTENQUIRIES@environment-agency.gov.uk ](mailto:HNL-APTENQUIRIES@environment-agency.gov.uk)to arrange a time slot.
This is the last passage window being offered by the EA until the repairs are completed | 19 Aug 26 09:00:02 |
|
| 30167 | Birmingham Canal Navigations (Daw End Branch) | Northywood Bridge | Aldridge Wharf Bridge | 09 February 2026 | 29 July 2027 | We kindly remind boaters to follow the signage in place at the site. In particular:
* Boaters must pass the site at tickover speed only.
* Boats should pass as close to the offside as possible to minimise bow waves and prevent the bunds from being pulled away from the waterway wall. | 29 Jul 26 17:51:18 |
|
| 30698 | Rochdale Canal | Butler Lane Lock No 81 | Ancoats Lower Lock No 83 | 31 March 2026 | 26 August 2027 | Investigation works have now been completed, and our contract partner, JN Bentley, is making good progress with the repair works.
The adjacent culvert has been repaired, and backfilling of the excavation is currently underway. Repairs to the canal bed and the sunken towpath will follow. To facilitate the canal bed repair, the flume supplying water downstream will need to be repositioned. Pumps will be on hand throughout this operation to help maintain water levels.
Work is progressing well, and completion is currently anticipated towards the end of October 2026.
Our teams continue to work hard to maintain water levels and minimise the impact on navigation. We will also continue to monitor levels closely. If you notice any sudden changes in water levels, please contact our North West Customer Support Team on 03030 404040.
Our next update will be provided on or before Wednesday 9 September 2026. | 26 Aug 26 10:00:03 |
|
| 31217 | Birmingham Canal Navigations (Walsall Junction Canal) | Walsall Bottom Lock | Walsall Top Lock | 27 May 2026 | 31 July 2027 | Due to ongoing water management measures and the resources required to progress this work, navigation at Walsall Lock Flight will remain closed until further notice.
We will provide a further update when more information becomes available. | 31 Jul 26 16:00:05 |
|
| 31255 | Huddersfield Narrow Canal | Stanley Dawson Lock No 1E | Booth Lock No 31E | 15 June 2026 | 04 August 2027 | Works taking place at Slaithwaite Reservoir have necessitated a drawdown of reservoir levels that has been ongoing for several months. With recent warm, dry weather and an increase in boat movement on the canal, we have insufficient water resources to maintain navigation for the long term on the lower section of the canal.
From Monday 15th June 2026 navigation between Lock 1E and Lock 31E will close with these locks being padlocked closed.
Whilst the closure is in effect passage will only be possible between Standedge Tunnel and Lock 31E. Anyone looking to transit through Standedge Tunnel from Diggle in the Northwest will only be permitted to do so with a return tunnel booking. Boats will be able to turn in the winding hole above Lock 31E.
Should levels in Slaithwaite Reservoir improve enough to provide an opportunity to open a passage window then details of this will be communicated by way of an update to this notice. | 04 Aug 26 10:00:06 |
|
| 32269 | Kennet and Avon Canal (Main Line) | Guyers Lock No 84 | Guyers Lock No 84 | 16 June 2026 | 21 August 2027 | Further to the notice below, please be advised that on Wednesday 26th August a one-day navigation closure is required to allow works to be undertaken at Benham Lock.
To facilitate these works we will be lowering the water level between Benham Lock and Higgs Lock.
Please do not moor within this pound whilst the works are taking place.
We will also be closing Guyers Lock to help maintain water levels for our customers within this pound.
We apologise for any inconvenience caused and thank you for your cooperation. | 21 Aug 26 18:21:07 |
|
| 31632 | Shropshire Union Canal (Montgomery Canal - isolated navigable section) | Bank Lock No 12 | Byles Lock No 22 | 01 July 2026 | 21 August 2027 | Please be advised that the water levels have returned to operational levels. Welshpool Lock will be unlocked this afternoon, but Belan and Pool Quay Locks will remain locked and sealed to maintain the filling of pounds until further notice. Passage will be supported by local teams as required.
We apologise for any inconvenience and thank you for your patience. | 21 Aug 26 16:00:07 |
|
| 31641 | Lancaster Canal (Glasson Branch) | Glasson Lock No 1 | Bridge No 2 (Glasson Branch) | 01 July 2026 | 26 August 2027 | Navigation remains closed between Lock 1 and Lock 7 Glasson Flight on the Lancaster Canal.
The forecast for rainfall this week is expected to have a positive impact on the current situation and may help replenish water levels. The local team will continue to closely monitor water levels over this period to assess whether conditions improve sufficiently to allow for the safe reopening of navigation.
A further update will be provided on or before Friday 28 August. | 26 Aug 26 16:00:04 |
|
| 31496 | Sheffield and South Yorkshire Navigation (Stainforth and Keadby Canal) | Keadby Junction Lock | Keadby Junction Lock | 06 July 2026 | 04 August 2027 | The repair was successful in stemming a large amount of the water entering the lock chamber. We can now recommence operating the lock when the river level is below that of the canal.
Some further remedial works are still required to allow us to use the lock at the lowest levels. Therefore, we will only currently accept bookings from up river, leaving West Stockwith Lock or Gainsborough Pontoon. Bookings from down river should be unaffected.
We will update with a date for the further works once they are planned in.
To make a booking / discuss travel times please contact the Lock Keeper on 07733 124611 | 04 Aug 26 10:00:02 |
|
| 31636 | Ripon Canal | Rhodesfield Lock | Bell Furrows Lock | 06 July 2026 | 29 July 2027 | Navigation Closure – Rhodesfield & Bellfurrows Locks- Ripon canal
Type: Navigation Closure
Waterway: Ripon Canal
Region: Yorkshire & North East
Effective From: 6 July 2026
Until: Further notice (ongoing)
Reason: Low Water Levels
Affected Section
* From: Lock 1 – Rhodesfield Lock
* To: Lock 2 – Bellfurrows Lock
Closure Details
The River Skell, which supplies water to the Ripon Canal, has fallen to critical levels following a prolonged period of low rainfall within the catchment area.
To conserve water and protect the canal network, Rhodesfield Lock and Bellfurrows Lock have been closed to navigation. As a result, the Ripon Canal is closed to through navigation.
This action has been taken to:
* Reduce water loss through lock operations.
* Protect wildlife habitats along the canal.
* Safeguard moored craft affected by low water levels.
Further Information
The situation is under continuous review. An update will be provided once water levels in the River Skell recover sufficiently to allow navigation to resume safely
Thank you
| 29 Jul 26 17:51:27 |
|
| 31718 | Leeds and Liverpool Canal (Stanley Dock Branch) | Great Howard Street Bridge No AA | Regent Road Bascule Bridge No BB | 08 July 2026 | 08 July 2027 | The Liverpool Link remains temporarily closed from while Peel carries out essential construction and maintenance works in the Central Docks.
We have worked to keep disruption to a minimum; however, as our rights are limited to permitting our customers to travel through Peel's property, the owners are able to close this section at any time to carry out necessary repairs and maintenance.
The Trust has very limited control over access to this area and has not been able to prevent this closure.
During this time, access to Albert Dock and Salthouse Dock will only be possible via Brunswick Lock, which can be booked directly through Liverpool Marina. This route requires a crossing from Ellesmere Port via the Manchester Ship Canal and the River Mersey.
We understand this may affect your plans, and we're working closely with Peel to keep disruption to a minimum. If you already have a booking during the closure period, our team will have been in contact to talk through any changes and help make alternative arrangements where needed. Outside of these dates, Liverpool Link passages and moorings into Salthouse Dock will continue as normal.
If you'd like to make a new booking or discuss an existing one, our North West Customer Service Team will be happy to help on 0303 0404 040. We are sorry for any disruption caused to your boating plans during this closure.
A further update will be provided on or before Monday 20 July. | 09 Jul 26 05:41:54 |
|
| 31734 | River Ribble (Ribble Link) | Ribble Link Staircase Public Art | Ribble Link Lock No 9 | 09 July 2026 | 17 August 2027 | Bookings for passage through the Ribble Link remain closed to protect the limited water available on the Lancaster Canal and maintain levels for safe navigation.
Our teams have been carrying out ongoing repairs to known leaks within the affected area on the Lancaster Canal, although water levels still remain low, we have seen a slight increase to the flows from Tewitfield over the weekend.
Our teams continue to monitor water levels across the canal daily and will review the situation regularly. We will provide an update every two weeks, or sooner if there is a change in conditions.
We will reinstate Ribble Link bookings as soon as water levels have recovered enough to allow the link to operate safely without putting further pressure on the available water supply.
If you are unable to move your boat, require assistance, or have specific circumstances that you would like to discuss, please contact our North West Customer Support Team on 0303 040 4040, and we will do our best to help.
A further update will be provided on or before Tuesday 1 September. | 17 Aug 26 14:00:06 |
|
| 31764 | Macclesfield Canal | Bosley Top Lock No 1 | Bosley Bottom Lock No 12 | 13 July 2026 | 25 August 2027 | The Marple Lock Flight remains open to navigation under the current operating restrictions, which are necessary to help manage water resources.
The lock flight will continue to operate as follows:
Marple Lock Flight – open Thursdays only, from 9 am to 1 pm
All boats must have exited the flight by 4 pm.
By implementing these operating times, we hope to enable boaters to plan their journeys with greater certainty, while our teams continue to work hard to conserve water at every opportunity.
You can help us conserve water by ensuring that paddles are fully closed once you have passed through a lock.
Although water storage levels across the canal network are higher than at this time last year, we are experiencing reduced inflows and some challenges with feeders from the Peak District reservoirs, which we are working to resolve. This is placing additional pressure on water management and canal operations.
We will continue to monitor reservoir levels and, where possible, adjust operating times if the situation improves. Please note that operating times will remain under review and may change as conditions develop.
Please also note that a navigation closure has been published for the Bosley Flight on the Macclesfield Canal. Further details can be found[here]( .
Once the Bosley Flight has reopened, restrictions will be reimplemented for the Bosley Flight.
A further update will be provided on or before Tuesday, 8 September. | 25 Aug 26 10:00:03 |
|
| 31771 | Peak Forest Canal (Lower) | Marple Bottom Lock No 1 | Marple Top Lock No 16 | 13 July 2026 | 25 August 2027 | The Marple Lock Flight remains open to navigation under the current operating restrictions, which are necessary to help manage water resources.
The lock flight will continue to operate as follows:
Marple Lock Flight – open Thursdays only, from 9 am to 1 pm
All boats must have exited the flight by 4 pm.
By implementing these operating times, we hope to enable boaters to plan their journeys with greater certainty, while our teams continue to work hard to conserve water at every opportunity.
You can help us conserve water by ensuring that paddles are fully closed once you have passed through a lock.
Although water storage levels across the canal network are higher than at this time last year, we are experiencing reduced inflows and some challenges with feeders from the Peak District reservoirs, which we are working to resolve. This is placing additional pressure on water management and canal operations.
We will continue to monitor reservoir levels and, where possible, adjust operating times if the situation improves. Please note that operating times will remain under review and may change as conditions develop.
Please also note that a navigation closure has been published for the Bosley Flight on the Macclesfield Canal. Further details can be found[here]( .
Once the Bosley Flight has reopened, restrictions will be reimplemented for the Bosley Flight.
A further update will be provided on or before Tuesday, 8 September. | 25 Aug 26 10:00:03 |
|
| 31772 | Pocklington Canal (Navigable Section) | Gardham Lock No 2 | Cottingwith Lock No 1 | 13 July 2026 | 29 July 2027 | Navigation Closure – Pocklington Canal
Waterway: Pocklington Canal
Location: Lock 9 (Cottingwith Lock) and Lock 8 (Gardam Lock)
Restriction Start: 08:00, Monday 13 July 2026
Type: Navigation Closure
Reason: Water Resources
Details
Due to significantly reduced rainfall across the catchment area, water levels in Pocklington Beck, which supplies the Pocklington Canal, have fallen to exceptionally low levels. Current forecasts indicate that no significant rainfall is expected in the coming weeks.
To proactively conserve available water resources and help maintain navigation on the remainder of the canal, Cottingwith Lock (Lock 9) and Gardam Lock (Lock 8) will be closed to navigation for the duration of this restriction.
Impact on Navigation
* Cottingwith Lock (Lock 9) and Gardam Lock (Lock 8) are closed to navigation.
* The restriction has been implemented to preserve water levels within the canal.
* Boaters should plan their journeys accordingly and take the closure into account.
* The closure will help conserve water resources while supporting the ecological requirements of the Pocklington Canal SSSI (Site of Special Scientific Interest).
We will continue to monitor water levels and review the restriction as conditions change. Further updates will be issued when more information becomes available.
We apologise for any inconvenience caused and thank customers for their understanding and cooperation.
| 29 Jul 26 17:51:35 |
|
| 31774 | River Derwent | Barmby Barrage | Barmby Barrage | 13 July 2026 | 29 July 2027 | Navigation Closure – Barmby Tidal Barrage
Asset: Barmby Tidal Barrage
Reference: RO-062-001
Type: Navigation Closure
Reason: Mechanical Failure
The Environment Agency has advised that a fault has developed affecting the operation of Barmby Tidal Barrage.
As a result, passage through the barrage is currently unavailable until further notice while the issue is investigated and resolved.
For the latest information regarding the fault and anticipated operational status, please contact Barmby Barrage directly on 0208 474 8798.
| 29 Jul 26 17:51:36 |
|
| 32222 | Grand Union Canal (Warwick and Birmingham Canal) | Bordesley Junction | Salford Junction Bridge No 110 | 14 July 2026 | 17 August 2027 | Although the planned HS2 works affecting the Saltley Flight have now been completed, the flight will remain closed to navigation until further notice to help protect water resources and maintain water levels across the wider network during the current period of dry weather.
Keeping the flight closed will help us manage available water supplies more effectively and support navigation on other parts of the network while current conditions persist. We will continue to monitor the situation closely and review the closure regularly.
Boaters are advised that an alternative route remains available via the Aston Flight, allowing access between the Birmingham & Fazeley Canal and the wider Birmingham Canal Navigations network.
We appreciate boaters' patience and cooperation during this period. Before travelling, please check for the latest information on our [website]( and plan your journey accordingly. | 17 Aug 26 18:01:26 |
|
| 31931 | Huddersfield Broad Canal | Colne Bridge Lock No 2 | Colne Bridge Lock No 2 | 24 July 2026 | 21 August 2027 | We have received the specialist parts required to carry out the repairs to the balance beam mechanism at Lock 2.
We are currently only awaiting the use of a suitable workboat to allow the team to safely access the mechanism and carry out the repairs. We are expecting to carry out the works next week.
We will provide a further update on the progress of the repairs by Friday 28th August 2026. | 21 Aug 26 14:00:03 |
|
| 31903 | Grand Union Canal (Northampton Branch) | Rothersthorpe Top Lock No 1 | Northampton Lock No 17 | 27 July 2026 | 18 August 2027 | Due to the ongoing dry weather and drought conditions affecting parts of England, The Northampton Arm remains closed.
We are continuing to monitor conditions and will update this notice as the situation develops. | 18 Aug 26 11:00:01 |
|
| 31994 | Trent and Mersey Canal (Caldon Branch - Uttoxeter Canal) | Uttoxeter Branch Lock No 1 | Uttoxeter Branch Lock No 1 | 30 July 2026 | 23 October 2026 | Repairs to Froghall Basin Lock have now been scheduled. Works are currently planned to commence during the week commencing 14 September 2026 and are expected to take approximately six weeks, with completion anticipated by 23 October 2026, subject to conditions on site.
Please also be advised that the car park adjacent to the lock will be closed for the duration of the works to facilitate contractor welfare facilities and site parking requirements. | 18 Aug 26 14:00:04 |
|
| 32004 | Lancaster Canal (Main Line) | Richmond Bridge Winding Hole | Hay Car Bridge No 83 | 30 July 2026 | 27 August 2027 | Our contractors are currently working on designs for a temporary scaffolding that will allow the works to be carried out safely to remove the damaged stonework and rebuilding of the bridge wall.
We anticipate repairs to start in the next couple of weeks, navigation at Bridge 81, Potters Bridge will remain closed daily between 6:00pm and 6:00am and this restriction will remain in place until further notice.
During the overnight closure period, vessels will not be permitted to pass beneath the bridge.
Between 6:00am and 6:00pm, navigation will remain open. To ensure safe passage, all boaters must make themselves known to the site operative stationed at the bridge before proceeding. The operative will temporarily stop traffic crossing the bridge to allow vessels to pass safely beneath the structure.
The signed towpath diversion remains in place and will continue to be in operation until all necessary repairs have been completed.
A further update will be provided on or before Thursday 10 September. | 27 Aug 26 17:00:03 |
|
| 31990 | Grand Union Canal (Hertford Union Canal) | Hertford Union Top Lock No 1 | Hertford Union Bottom Lock No 3 | 30 July 2026 | 19 August 2027 | Please be advised that due to the continued low water levels, the Hertford Union Canal closure has been extended. This is to help our ongoing efforts to manage the water levels across the wider network and to maintain navigational Safety. The situation will be reviewed on Thursday, 24 September and a further update will be provided at that time. We appreciate your continued patience and understanding during this period. | 19 Aug 26 16:00:02 |
|
| 31976 | Trent and Mersey Canal (Caldon Branch - Main Line to Froghall) | Brindley Statue | Cheddleton Lock No 14 | 01 August 2026 | 29 July 2027 | Due to continued pressure on water resources, the Caldon Canal will be temporarily closed to navigation from 9am, Saturday 1 August 2026 until further notice.
Following ongoing assessments by our operational and water management teams, this temporary closure is necessary to conserve water, protect canal infrastructure, and support the longer-term management of the navigation.
From 9am, Saturday 1 August 2026, navigation will be suspended between Locks 1 and 14.
We recognise that closures can have a significant impact on our customers; if this closure creates particular difficulties for you, please get in touch with us to discuss your circumstances. We will do our best to identify any support or assistance that we may be able to offer. Contact: 0303 040 4040 or enquiries.westmidlands@canalrivertrust.org.uk
This decision has not been taken lightly. However, it is necessary to help manage limited water resources and safeguard the canal network during a period of sustained pressure on water availability.
The closure will remain under regular review and will be lifted as soon as conditions allow. We will continue to provide updates as the situation develops.
Boaters are encouraged to check the latest navigation notices before travelling, as operating arrangements may change at short notice.
We sincerely appreciate the patience, understanding, and cooperation of all boaters during this challenging period. | 29 Jul 26 17:51:49 |
|
| 32037 | River Kennet | Sulhampstead Lock No 100 | Sulhampstead Lock No 100 | 01 August 2026 | 21 August 2027 | Further to the notice below, please be advised that the works at Sulhamstead Lock have been delayed.
Contractors will now be on site on Tuesday 1st September.
We will provide further updates as the works progress.
Thank you for your patience and understanding. | 21 Aug 26 15:00:04 |
|
| 31874 | Stratford-on-Avon Canal (Southern Section) | Lapworth Lock No 22 | Stratford Bottom Lock No 55 | 03 August 2026 | 24 August 2027 | The South Stratford Canal will be closed to navigation between Lock 22, Lapworth and Lock 55, Stratford upon Avon from Monday 3 August 2026 until further notice.
This temporary closure will help conserve water and allow the affected section to recover, supporting the sustainability of navigation on the South Stratford Canal and the wider connected canal network.
To help conserve water supplies before the closure comes into effect, we ask boaters to undertake only essential journeys within the affected section where possible.
We appreciate that this closure may affect planned journeys and apologise for the inconvenience caused. Our teams will continue to monitor conditions closely and we will provide further updates as they become available.
We would like to thank boaters and other waterway users for their patience, understanding and cooperation during this period. | 24 Aug 26 13:00:03 |
|
| 31795 | Grand Union Canal (Warwick and Birmingham Canal) | Camp Hill Top Lock No 52 | Knowle Top Lock No 51 | 03 August 2026 | 24 August 2027 | The Grand Union Canal will be closed to navigation between Camp Hill Top Lock and Knowle Top Lock from Monday 3 August 2026 until further notice.
This temporary closure will help conserve water and allow the affected section to recover, supporting the sustainability of navigation on both the Grand Union Canal south of Lapworth and the South Stratford Canal.
An alternative route will remain available via the Worcester & Birmingham Canal.
We appreciate that this closure may affect planned journeys and apologise for the inconvenience caused. Our teams will continue to monitor conditions closely and we will provide further updates as they become available.
We would like to thank boaters and other waterway users for their patience, understanding and cooperation during this period. | 24 Aug 26 15:00:01 |
|
| 32056 | Lee and Stort Navigation (River Stort - Main Line) | Roydon Lower Lock No 15 | Harlow Lock No 8 | 03 August 2026 | 18 August 2027 | We wanted to provide a quick update on the current water levels.
Water levels are still low and we will continue to monitor them closely on a daily basis. Unfortunately, we need a substantial amount of rainfall before we are likely to see water levels recover fully.
We understand this may not be the update you were hoping for and we appreciate your patience while we continue to keep a close eye on the situation.
We'll update this notice again as soon as we have any further information to share.
Thank you for your continued understanding and cooperation. | 18 Aug 26 12:00:02 |
|
| 32018 | Coventry Canal (Main Line - Hawkesbury to Fazeley) | Atherstone Top Lock No 1 | Atherstone Bottom Lock No 11 | 04 August 2026 | 03 August 2027 | Please note the final entry onto the Atherstone Lock Flight will be 12 noon tomorrow. | 03 Aug 26 09:00:02 |
|
| 32092 | Oxford Canal (Southern Section - Main Line) | Claydon Top Lock No 17 | Aynho Weir Lock No 33 | 05 August 2026 | 18 August 2027 | We wanted to provide a quick update on the current water levels.
Water levels are still low and we will continue to monitor them closely on a daily basis. Unfortunately, we need a substantial amount of rainfall before we are likely to see water levels recover fully.
We understand this may not be the update you were hoping for and we appreciate your patience while we continue to keep a close eye on the situation.
We'll update this notice again as soon as we have any further information to share.
Thank you for your continued understanding and cooperation. | 18 Aug 26 12:00:01 |
|
| 32110 | Shropshire Union Canal (Llangollen Canal - Main Line) | Swanley Lock No 6 | Baddiley Lock No 9 | 06 August 2026 | 21 August 2027 | Following our last update, our teams and engineers have carried out detailed surveys and investigations of the damaged canal embankment, towpath and culvert. The findings are currently being reviewed with technical specialists and will help form the design of the permanent repair and determine the scope of the construction works required. The team will also need to carry out further investigations before the repair works begin.
The team will continue to monitor the site and progress with their investigations to support the development of a permanent repair solution.
The canal water levels remain stable, with normal water flows maintained, and Hurleston Reservoir continues to operate as normal.
While it is still too early to confirm a timescale for the repair works, due to the scale and complexity of the damage means we expect the permanent repair works to take months to complete once repairs begin. We will provide further details on the anticipated timeline as our investigations and design work progresses.
The sections of the canal that remain open and unaffected by the closure are from Llangollen Basin to Bridge 31A (Whitchurch By-Pass Bridge), and from there onwards to Swanley.
We understand the disruption this closure is causing and are continuing to work towards a safe and lasting repair. Our Customer Support team remains in contact with those most directly affected and will continue to provide advice and support where possible.
If you require assistance, or have specific circumstances that you would like to discuss, please contact our North West Customer Support Team on 0303 040 4040, and we will do our best to help.
We will provide a further update on or before Friday, 4 September. | 21 Aug 26 16:00:05 |
|
| 32090 | Oxford Canal (Southern Section - Main Line) | Napton Bottom Lock No 8 | Marston Doles Top Lock No 16 | 09 August 2026 | 12 August 2027 | Please be advised of updated arrangements for Thursday 13 August only, after which the closure will resume at Napton & Marston Doles Locks 8, 14, 15 and 16.
The aim of this closure is to reduce water demand and allow water levels to recover during the current dry spell.
To accommodate craft travelling through Lock 17, we will temporarily open the flight on Thursday 13 August:
* Lock 16 will be open from 08:00 until 11:00 for boats entering the flight.
* Boats entering at Lock 16 will be permitted to continue through and exit at Lock 8 by 13:00.
* All craft must be clear of the affected section prior to the reintroduction of the closure.
* No mooring is permitted between Locks 8 and 16.
Boaters are advised to plan their passage carefully and allow sufficient time to clear the flight before the closure resumes.
Thank you for your understanding and cooperation. You can read about other ways to help preserve water supplies on our website.
A further update will be provided by Monday 31 August, or sooner if the situation changes. | 12 Aug 26 10:00:01 |
|
| 32156 | Macclesfield Canal | Bosley Top Lock No 1 | Bosley Bottom Lock No 12 | 11 August 2026 | 14 August 2027 | Our teams have assessed the works required at Lock 6 on the Bosley Flight of the Macclesfield Canal and have planned the method of repair.
Work will begin on site on Monday 17 August, to reline the head and tail gates and reattach the cill bumper at Lock 6. We anticipate that the works may take up to four weeks to complete.
These essential repairs are necessary to avoid significant water loss through the lock and to ensure the continued safe operation of the flight.
A further update will be provided on or before Tuesday 8 September. | 14 Aug 26 14:00:02 |
|
| 32146 | Oxford Canal (Southern Section - Main Line) | Aynho Weir Lock No 33 | Aynho Weir Lock No 33 | 17 August 2026 | 02 October 2026 | Lock 33 is being closed due to drought conditions, whilst this is in place we will be completely a 2027 stoppage to change both top and bottom lock gates and stop plank groves.
There will be review points throughout the works if conditions change and they canal is to re-open. this currently looks like the following
• Works at Lock 33 are expected to commence during the week commencing 17th August.
• Replacement of the top gates is expected to be completed during the week commencing 31st August.
• At that point, the project team will review progress on site, alongside prevailing water levels, weather conditions and any rainfall received across the catchment, to determine whether any navigation passage opportunity can be safely provided.
• Following repositioning of the crane boat, works will begin on the bottom gates, with completion currently anticipated by 25 September.
• This will be followed by approximately four days of demobilisation and making the site safe.
• Subject to conditions and successful completion of the works, a planned navigation passage window is currently expected between 2 and 4 October.
As with all works taking place during the current drought conditions, the programme will be kept under constant review. We are holding regular internal meetings to monitor progress, water resource conditions and navigation impacts, and we will continue to assess opportunities to minimise disruption wherever possible.
We wanted to provide this update as early as possible given the interest many of you have shown in the planned works and the feedback you previously shared.
Your comments played an important role in helping us understand the potential business impacts of a future planned closure, and we are grateful for the constructive engagement we have received throughout.
We will continue to keep you informed as the works progress and will issue further updates should any aspect of the programme change. | 10 Aug 26 20:36:31 |
|
| 32224 | Leeds and Liverpool Canal (Main Line - Wigan to Leeds) | Bank Newton Top Lock No 41 | Office Lock No 2 | 17 August 2026 | 25 August 2027 | Gargrave to Bank Newton — Now Open
The navigation between Gargrave and Bank Newton (Lock 30 to Lock 41) is now open.
The locks will operate daily between 10:00am and 4:00pm.
Bingley Five Rise & Three Rise — Now Open
The Bingley Five Rise and Three Rise lock flights are now open, as of Monday 24 August.
The flights will operate on Monday, Wednesday, Friday and Sunday at the following times:
Morning
* Down: 08:00–10:00 — last entry at 09:00
* Up: 10:00–12:00 — last entry at 11:00
Afternoon
* Down: 13:00–15:00 — last entry at 14:00
* Up: 15:00–17:00 — last entry at 16:00
Boaters are advised to plan their passage accordingly and ensure they arrive in sufficient time for the last entry.
Newlay, Forge & Kirkstall Locks
The locks will be available for passage on Tuesday, Thursday and Saturday, operating to the normal summer operating times at between 08:00 and 16:00
Office Lock 2 will be opened on Thursday 27th Aug | 25 Aug 26 15:00:06 |
|
| 32246 | Trent and Mersey Canal (Main Line - Harding's Wood to Middlewich) | Rumps Lock No 70 | Booth Lane Top Lock No 67 | 20 August 2026 | 25 August 2027 | Our local team has successfully raised the water levels between Locks 67 and 71 on the Trent and Mersey Canal, and navigation has now resumed.
However, in order to protect against further loss of water, lock 67 to lock 71 will be closed daily at 4pm and reopen the following morning from 9am until further notice.
A further update will be provided on or before Monday 7 September. | 25 Aug 26 12:00:01 |
|
| 32251 | Leeds and Liverpool Canal (Main Line - Wigan to Leeds) | Wigan Bottom Lock No 85 | Wigan Top Lock No 65 | 20 August 2026 | 24 August 2027 | Navigation remains closed between Lock 65 and Lock 85 on the Wigan Flight of the Leeds & Liverpool Canal due to a detached cill at lock 69.
Our local team have carried out inspections of the head cill and have planned a method of repair. However, works have been delayed due to other priority jobs along the network and we anticipate the repairs to begin on the week commencing 31st August.
A further update will be provided on or before Tuesday 1 September. | 24 Aug 26 16:00:01 |
|
| 32257 | Grand Union Canal (Leicester Section - River Soar Navigation) | Zouch Lock No 55 | Zouch Lock No 55 | 20 August 2026 | 27 August 2027 | Unfortunately, the work recently carried out to plank and board the lock gates has not been successful. The lock cannot currently be operated safely because the chamber is not equalising correctly. This creates excessive pressure on the gates and balance beams during operation, and as a result the lock remains chained off and closed to navigation.
A full lock dewatering operation is now required so that colleagues can carry out further investigations and identify the underlying cause of the problem.
Due to the lock's location and its proximity to the River Soar, the site set-up needed to undertake this work safely is particularly complex. The current review date shown on this notice reflects our best estimate of when the lock may be able to reopen based on the information available today.
We recognise that this continued uncertainty makes it difficult for customers to plan journeys with confidence. We will continue to review progress and update this notice with further information as soon as it becomes available. | 27 Aug 26 13:00:03 |
|
| 32292 | Kennet and Avon Canal (Main Line) | Froxfield Bottom Lock No 70 | Wootton Rivers Top Lock No 54 | 24 August 2026 | 28 August 2026 | Further to the notice below, we are pleased to confirm water levels are recovering well.
The navigation will reopen from 10.30 am onwards on Friday the 28th August from Lock 54 to Lock 70.
Please make sure all gates are closed correctly and that all local instruction is followed.
Thank you for your patience and cooperation. | 27 Aug 26 16:00:04 |
|
| 32304 | Monmouthshire and Brecon Canal | Solomon’s Bridge No 47 | Jockey Bridge No 55 | 25 August 2026 | 25 August 2027 | We would like to advise our customers that we have had to close the stretch of canal between Bridge 47 and Bridge 55 due to a bed valve failure, which has resulted in a small leak within the canal bed.
Contractors have carried out temporary repair works; however, the permanent repair will be undertaken during the winter maintenance programme.
We apologise for any inconvenience this may cause and thank you for your cooperation and understanding. | 25 Aug 26 18:30:50 |
|
| 32288 | Grand Union Canal (Regent's Canal) | Hampstead Road Locks Nos 1A & 1B | Kentish Town Lock No 3 | 26 August 2026 | 27 August 2027 | Please be advised there will be ongoing overnight closures in Camden at Lock 1, Hampstead Road Lock (A and B), Lock 2, Hawley Lock and Lock 3, Kentish Town Lock between 15:30 and 09:00. This is to help maintain navigational safety and water management, during this period of drought. We appreciate your patience and understanding | 27 Aug 26 10:00:02 |
|
| 32321 | Droitwich Canals (Droitwich Junction Canal) | Body Brook Lock No 6 | Swan Drive Bridge No 7 | 27 August 2026 | 27 August 2027 | Due to the canalization of the River Salwarpe between these two locks, we have temporarily closed them to ensure the safety of boaters during current flood conditions.
We will keep monitoring the situation and will reopen the locks as soon as it is safe to do so. | 27 Aug 26 18:00:44 |
|
| 32309 | Sheffield and South Yorkshire Navigation (Sheffield Canal) | Tinsley Top Lock No 1 | Tinsley Bottom Lock No 12 | 29 August 2026 | 31 August 2026 | The Tinsley Lock flight will be closed on the 29th and 30th of August due to staff sickness.
It will be open as normal for boaters from the 31st of August. | 27 Aug 26 18:01:06 |
|
| 32255 | Leeds and Liverpool Canal (Liverpool Link) | Jesse Hartley Wy Bridge | Jesse Hartley Wy Bridge | 02 September 2026 | 03 September 2026 | Third party contractors will be on site at the Liverpool Link, at Jesse Hartley Way, Central Docks, Channel Bridge on Wednesday 2 September from 8.00am to Thursday 3 September 6pm, The works involves lifting and positioning bridge support beams onto the abutments, this will take place across the Liverpool Link and, for safety reasons, navigation through the Link will remain closed for the duration of the works.
Our Customer Support Team has contacted all boaters with pre-booked passages to reschedule their journeys. If you need to discuss an existing booking, please use the following link: [Contact us | Canal & River Trust]( " ) | 20 Aug 26 17:55:44 |
|
| 32237 | Grand Union Canal (Regent's Canal) | City Road Lock No 5 | Sturt's Lock No 6 | 05 September 2026 | 07 September 2026 | Please be advised there will be a temporary navigational closure between City Road Lock and Sturts Lock from 3pm on the 5th September until 9am on the 7th September. This temporary closure is being implemented to support our water conservation and water management efforts during the Angel Canal Festival.
<
We appreciate your patience and understanding during this time. | 19 Aug 26 18:26:10 |
|
| 32164 | Grand Union Canal (Regent's Canal) | Limehouse Lock No 13 | Limehouse Lock No 13 | 12 September 2026 | 12 September 2026 | Please be aware that Limehouse Lock will be closed to all passages on Saturday 12th September due to the Great River Race.
We appreciate your understanding and cooperation while this event takes place and thank you for your patience. | 12 Aug 26 19:07:46 |
|
| 32296 | Chesterfield Canal (Retford to the Trent) | West Stockwith Lock | West Stockwith Lock | 14 September 2026 | 18 September 2026 | Please be advised that Lock 65, West Stockwith Lock will be closed to navigation to allow essential refurbishment works to be carried out on the lock gates.
The works include refurbishment of the gate hydraulic cylinders, together with renewal of the associated hydraulic cylinder framework and gate bracketry. These repairs are required due to the deteriorating condition of the assets and to address issues with gate operation.
Thank you for your patience while these important works are completed. | 25 Aug 26 18:31:07 |
|
| 32079 | Grand Union Canal (Regent's Canal) | Limehouse Lock No 13 | Limehouse Lock No 13 | 30 September 2026 | 02 October 2026 | Limehouse Lock Closure
Limehouse Lock will be temporarily closed from Wednesday 30th September to Friday 2nd October while our contractors carry out essential repairs to the damaged walkway on the inner lock gates.
During this period, Limehouse Lock bookings will not be available. We kindly ask that you use an alternative route where possible.
Thank you for your patience and understanding while these important repairs are completed. | 04 Aug 26 18:33:23 |
|
| 30911 | River Kennet | Heals Lock No 93 | Heals Lock No 93 | 05 October 2026 | 20 November 2026 | We apologise for the need to schedule an in‑season stoppage on the Kennet & Avon Canal.
We are carrying out essential improvement works at Heales Lock 93, including the replacement of the top and bottom gates.
To complete this work safely, a stoppage will be in place from 5th October until the 20th November.
These works were originally planned for the recent intensive maintenance period but had to be deferred due to flooding and river conditions preventing mobilisation to site.
Following local consultation it has been agreed that this is the preferred time to undertake these essential works.
Thank you for your understanding and patience while these improvements take place.
You are welcome to contact us at [enquiries.walessouthwest@canalrivertrust.org.uk](mailto:enquiries.walessouthwest@canalrivertrust.org.uk) or 03030 404040 if you would like to discuss this information with a member of our Customer Service Team. | 04 Aug 26 09:00:04 |
|
| 32148 | Birmingham Canal Navigations (Birmingham and Fazeley Canal - Digbeth Branch) | Former Coldfield Iron Works Basin | Curzon Street Tunnel (southern entrance) | 25 November 2026 | 12 March 2027 | Contractors working on behalf of High Speed 2 Limited will be building the High Speed 2 Curzon 3 railway viaduct over the Digbeth Branch Canal. During this time the canal and canal towpath will need to be closed due to lifting and other high risk operations. We are currently exploring whether opportunities may exist to provide temporary navigation openings during the works; however, this remains under review and cannot be guaranteed at this stage. Further updates will be provided as arrangements are confirmed. | 12 Aug 26 19:11:04 |
|
| 32149 | Grand Union Canal (Leicester Section - Old Grand Union) | Foxton Top Staircase | Foxton Junction | 01 February 2027 | 03 February 2027 | A navigation closure is required to carry out dewatering of the lock flight and side ponds for fisheries management purposes. Please note, the navigation will be closed between lock 8 and 17 | 12 Aug 26 19:11:31 |
|